Batch Operation
Example: Fa. Bandex


ProWin® has been installed for Bandex, a woven tapes manufacturer, in their factories in Sulz-Röthis (Austria) and Manchester (UK). ProWin® is set up to control all stages of production, such as weaving, dyeing, printing etc. Both factories are connected online.

ProWin® offers the basis for the realization of a CIM strategy aiming at synchronizing the flow of information and material, overcoming interfaces and reducing superfluous redundancies. Moreover, it renders possible methods such as production scheduling, store planning and automated cost accounting.

With ProWin®, the system offers a better controllability and production processes may be repeated identically. Plenty of solutions arise for process visualization and simulation, specified for the individual requirements of a company.
 
Batch operation
 
Automated charging of machines with batch production tasks
Machine data
aquisition

 
Aquisition and saving of all operation and error data of the machines, enabling detailed error analysis
Set-up plans
 
 
Organisation of the individual set-up plans required for each product, output before start of production
Work schedule
 
Administration of schedules for four-shift-operation
Process visualization
 
 
 
 
 
 
 
 
Display of machine condition, current tasks, remaining quantities, errors etc... Trend data of machine is archived for error analysis. Managing/production director´s PC is linked to important SCADA servers, enabling cross-plant data availability.
Sample editor
 
Editor for setting product-specific parameters
Datenbase
 
 
 
Foxpro database for saving and evaluating task- and machine data, linked to intern VAX